Brida para sujeción de retenida compatible con tramos STZ30G, Galvanizado en Caliente.
Brida para sujeción de retenida compatible con tramos STZ30G, Galvanizado en Caliente.
Disponible:
En Stock
- SKU SJB-30G
- Categoria Redes e IT > Torres y Mástiles > Accesorios para Torres Arriostradas
$ 820.01 MXN
Key Features
- Complies with ISO 9000 standards for exceptional quality
- Delta type flange with central pivot point
- Uniform tension distribution on guy wires
- Hot-dip galvanized for resistance
- Includes grade 5 hardware and safety nut
Application
- Designed for STZ30G section towers
- For installations with guy wires
- Tension distribution system for guy cables
- Prevents structural deformation due to improper guy wire placement
Installation Notes
- Guy wire lengths are calculated to place anchors at 70% of the total tower height
- Ground anchors can be replaced by SAP01 or SAP01G wall anchors depending on the application
- Installation must only be performed by qualified personnel
- A soil resistance study is recommended to plan proper foundation
Installation Dimensions
| Tower Height (m) | L1 (m) | L2 (m) | h1 (m) | h2 (m) | h3 (m) | h4 (m) | h5 (m) |
|---|---|---|---|---|---|---|---|
| 3 | 2.1 | - | 2.5 | - | - | - | - |
| 6 | 4.2 | - | 5.4 | 2.7 | - | - | - |
| 9 | 6.3 | - | 8.1 | 4.0 | - | - | - |
| 12 | 8.4 | - | 11.0 | 6.0 | - | - | - |
| 15 | 10.5 | - | 14.0 | 9.0 | 4.5 | - | - |
| 18 | 12.6 | - | 17.0 | 11.0 | 5.6 | - | - |
| 21 | 14.7 | - | 19.5 | 13.0 | 6.5 | - | - |
| 24 | 16.8 | - | 23.0 | 17.5 | 12.0 | 6.0 | - |
| 27 | 19.0 | - | 26.0 | 19.5 | 13.0 | 6.5 | - |
| 30 | 21.0 | - | 28.5 | 22.5 | 17.0 | 11.5 | 6.0 |
Additional Notes
- Distances are only installation recommendations
- For calculating extra guy wires on towers with a stabilizer, this replaces the flange located at 3/4 of the tower height or the closest to this height
- A soil resistance study is recommended to plan proper foundation
- Obstruction lights are recommended at all times
Key Features
- Complies with ISO 9000 standards for exceptional quality
- Delta type flange with central pivot point
- Uniform tension distribution on guy wires
- Hot-dip galvanized for resistance
- Includes grade 5 hardware and safety nut
Application
- Designed for STZ30G section towers
- For installations with guy wires
- Tension distribution system for guy cables
- Prevents structural deformation due to improper guy wire placement
Installation Notes
- Guy wire lengths are calculated to place anchors at 70% of the total tower height
- Ground anchors can be replaced by SAP01 or SAP01G wall anchors depending on the application
- Installation must only be performed by qualified personnel
- A soil resistance study is recommended to plan proper foundation
Installation Dimensions
| Tower Height (m) | L1 (m) | L2 (m) | h1 (m) | h2 (m) | h3 (m) | h4 (m) | h5 (m) |
|---|---|---|---|---|---|---|---|
| 3 | 2.1 | - | 2.5 | - | - | - | - |
| 6 | 4.2 | - | 5.4 | 2.7 | - | - | - |
| 9 | 6.3 | - | 8.1 | 4.0 | - | - | - |
| 12 | 8.4 | - | 11.0 | 6.0 | - | - | - |
| 15 | 10.5 | - | 14.0 | 9.0 | 4.5 | - | - |
| 18 | 12.6 | - | 17.0 | 11.0 | 5.6 | - | - |
| 21 | 14.7 | - | 19.5 | 13.0 | 6.5 | - | - |
| 24 | 16.8 | - | 23.0 | 17.5 | 12.0 | 6.0 | - |
| 27 | 19.0 | - | 26.0 | 19.5 | 13.0 | 6.5 | - |
| 30 | 21.0 | - | 28.5 | 22.5 | 17.0 | 11.5 | 6.0 |
Additional Notes
- Distances are only installation recommendations
- For calculating extra guy wires on towers with a stabilizer, this replaces the flange located at 3/4 of the tower height or the closest to this height
- A soil resistance study is recommended to plan proper foundation
- Obstruction lights are recommended at all times