Brida para sujeción de retenida compatible con tramos STZ35G, Galvanizado en Caliente.
Review: 5 -
Rated 5/5 based on 11 customer reviews
"Excelentes productos" by , written onJun 4, 2021
Los productos siempre en tiempo y forma.

Brida para sujeción de retenida compatible con tramos STZ35G, Galvanizado en Caliente.

Disponible: En Stock
  • SKU SJB-35G
$ 929.20 MXN
Image

Main Features

  • Complies with ISO 9000 standards for superior quality
  • Delta type flange with central support
  • Uniform tension distribution in cables
  • Hot-dip galvanized
  • Includes grade 5 hardware and safety nut

Applications

  • For STZ35G section towers
  • Installations with heavy weight loads
  • Large antenna surface loads
  • Areas with strong wind currents

Installation Notes

  • Installation must be carried out by qualified personnel
  • Distances are only installation recommendations
  • Guy wire lengths are calculated for anchors at 70% of the height
  • Soil resistance study is recommended for foundation
  • Floor anchors can be replaced by wall anchors (SAP01 or SAP01G) depending on the application

Dimensions

Tower Height (m) L1 (m) L2 (m) h1 (m) h2 (m) h3 (m)
3 2.1 - 2.5 - -
6 4.2 - 5.4 2.7 -
9 6.3 - 8.1 4.0 -
12 8.4 - 11.0 6.0 -
15 10.5 - 14.0 9.0 4.5
18 12.6 - 17.0 11.0 5.6

Additional Notes

  • Towers with stabilizers replace the flange located at 3/4 height
  • It is recommended to install obstruction lights at all times

Download the technical sheet here

Main Features

  • Complies with ISO 9000 standards for superior quality
  • Delta type flange with central support
  • Uniform tension distribution in cables
  • Hot-dip galvanized
  • Includes grade 5 hardware and safety nut

Applications

  • For STZ35G section towers
  • Installations with heavy weight loads
  • Large antenna surface loads
  • Areas with strong wind currents

Installation Notes

  • Installation must be carried out by qualified personnel
  • Distances are only installation recommendations
  • Guy wire lengths are calculated for anchors at 70% of the height
  • Soil resistance study is recommended for foundation
  • Floor anchors can be replaced by wall anchors (SAP01 or SAP01G) depending on the application

Dimensions

Tower Height (m) L1 (m) L2 (m) h1 (m) h2 (m) h3 (m)
3 2.1 - 2.5 - -
6 4.2 - 5.4 2.7 -
9 6.3 - 8.1 4.0 -
12 8.4 - 11.0 6.0 -
15 10.5 - 14.0 9.0 4.5
18 12.6 - 17.0 11.0 5.6

Additional Notes

  • Towers with stabilizers replace the flange located at 3/4 height
  • It is recommended to install obstruction lights at all times

Download the technical sheet here